Matt Kendall
- Indexed articles, last 90 days
- 4
- Latest publication
- Aug 13, 2026
- Outlet visibility, for RCR Wireless News
- Top 5M sites
- Earliest in this view
- Jul 27, 2026
Latest articles
AI fiber build-out undermines rural BEAD skills-drive (opens the original)
Read excerpt
AI data centers and rural broadband are fighting over the same workers. AT&T and Meta are hiring thousands of fiber technicians to meet AI data center demand. But that is pulling skilled trades away from BEAD’s rural broadband rollout, and the pressure is likely to worsen in 2027. One pool, two priorities – The US is already short of 58,000 skilled tradesworkers to meet BEAD’s rural broadband goals; AI data centers are drawing on the same pipeline. Carriers have upper hand – Large-scale hiring b
AI fiber build-out undermines rural BEAD skills-drive (opens the original)
Read excerpt
AI data centers and rural broadband are fighting over the same workers. AT&T and Meta are hiring thousands of fiber technicians to meet AI data center demand. But that is pulling skilled trades away from BEAD’s rural broadband rollout, and the pressure is likely to worsen in 2027. One pool, two priorities – The US is already short of 58,000 skilled tradesworkers to meet BEAD’s rural broadband goals; AI data centers are drawing on the same pipeline. Carriers have upper hand – Large-scale hiring b
Building the AI backbone, waiting on the AI billions (opens the original)
Read excerpt
Verizon, AT&T, and SK Telecom are betting big on AI infrastructure. But technology advisory group Omdia says the headline numbers are ceilings, and warns revenue will trail capacity growth for years. Unproven scale – Verizon’s $1bn Google DCI agreement is signed and live; Schulman’s claim of a multi-billion-dollar “growth vector” from 2027 is still a forecast. Small contracts – Hyperscalers spec deals at their eventual ceiling (sometimes 400 waves of capacity) but sign carriers up for a fraction
Ten years to scale hollow-core fiber – regarding HKT’s 3.2Tbps DCI ‘superhighway’ (opens the original)
Read excerpt
HKT’s hollow-core fiber AI ‘superhighway’ highlights the tech’s promise for ultra low-latency DCI networks, but analyst CRU Group says costs, ecosystems, and production mean at-scale adoption is years away. High costs – Hollow-core fiber cost runs between $3,000-5,000 per fiber kilometer; parity with standard fiber is unlikely to be achieved in the next 10 years. Slow production – Yield for hollow-core fiber sits at 10% versus standard fiber, and the surrounding ecosystem still lacks common stan
Publishing over time
Last 90 days. Choose a month to open its work.
Recurring subjects
Named in the text we hold. One piece can cover several.
Audience
Top 5M sites
For RCR Wireless News, the outlet · Measured Aug 1, 2026
Website popularity band, not a count of readers or article views.
About this data
Counts cover the work we have indexed. Tone needs enough text and a confident classification. Excerpts and episode notes are not full articles or transcripts.
Identity or attribution wrong? Suggest a correction.