Skip to content
HeyJared

Leslie Nemo

Reporter · US

Indexed articles, last 90 days
4
Latest publication
Sep 11, 2026
Outlet visibility, for enr.com
Top 1M sites
Earliest in this view
Jul 27, 2026

Latest articles

  1. Article · Sep 11, 2026 · Leslie Nemo

    Engineers, Building Trades Reflect on Industry's Sept. 11 Impacts, Legacy (opens the original)

    Excerpt · English

    Read excerpt

    Sept. 11, 2001 started as a normal Tuesday for construction professionals working in New York City and Washington, D.C.— but unprecedented events that occurred before many even made it to work changed work life not just for those individuals, but also for the industry and how it builds for the nation and the world over the quarter-century since. The planned terrorism of commercial airliners crashing deliberately into the iconic World Trade Center twin towers in Manhattan and U.S. Pentagon in Arl

  2. Article · Sep 11, 2026 · Leslie Nemo

    Engineers, Building Trades Reflect on Industry's Sept.11 Impacts, Legacy (opens the original)

    Excerpt · English

    Read excerpt

    Sept. 11, 2001 started as a normal Tuesday for construction professionals working in New York City and Washington, D.C.— but unprecedented events that occurred before many even made it to work changed work life not just for those individuals, but also for the industry and how it builds for the nation and the world over the quarter-century since. The planned terrorism of commercial airliners crashing deliberately into the iconic World Trade Center twin towers in Manhattan and U.S. Pentagon in Arl

  3. Article · Aug 17, 2026 · Leslie Nemo

    JFK’s New Terminal One Aims to Cut Its Future Electric Bill (opens the original)

    Excerpt · English

    Read excerpt

    When the New JFK Terminal One's (NTO) first phase is complete in 2027, some 500,000 sq ft of its flooring will have a radiant heating and cooling system lying under the concrete. The roughly 11 acres of tubing will be at least partially made possible by a rooftop microgrid, another site choice motivated by efforts to keep the energy use of the $9.5 billion-dollar terminal in check. The team behind the New Terminal One opted for these and other unusual infrastructure choices because it has to com

  4. Article · Jul 27, 2026 · Leslie Nemo

    Manhattan Greenway Set to Strengthen With $163 Million Renovation (opens the original)

    Excerpt · Positive tone · English

    Read excerpt

    Plans to smooth out the New York City bicycling experience moved forward last month when the New York City Dept. of Design and Construction awarded a roughly $163 million project to renovate a roughly half-mile stretch along Manhattan’s east side. The design-build project, called the East Side Greenway 14th Street Connector, was awarded to the joint venture of Skanska USA Building Inc. and Claire Weisz Architects LLP (otherwise known as WXY architecture + urban design). The two other candidates,

Publishing over time

Last 90 days. Choose a month to open its work.

Recurring subjects

Named in the text we hold. One piece can cover several.

Audience

Top 1M sites

For enr.com, the outlet · Measured Aug 1, 2026

Website popularity band, not a count of readers or article views.

About this data

Counts cover the work we have indexed. Tone needs enough text and a confident classification. Excerpts and episode notes are not full articles or transcripts.

Identity or attribution wrong? Suggest a correction.

See coverage about Leslie Nemo