Amanda Durish Cook
- Indexed articles, last 90 days
- 11
- Latest publication
- Sep 25, 2026
- Outlet visibility, for RTO Insider
- Top 5M sites
- Earliest in this view
- Jul 5, 2026
Latest articles
MISO Asks FERC for Queue Restudy Cutback, 1-shot Exit Ramp for 2022 Projects (opens the original)
Read excerpt
Looking to read the full article? Scroll down and login or sign up today! Page Reload Scroll Position MISO Asks FERC for Queue Restudy Cutback, 1-shot Exit Ramp for 2022 Projects MISO lead planners Laura Rauch (left) and Aubrey Johnson at MISO Board Week in September 2026 in Little Rock, Ark. | © RTO Insider Sep 24, 2026 | Amanda Durish Cook MISO has filed a plan with FERC to reduce restudies in its interconnection queue and hand out a one-time pardon for generation proposals that entered its qu
MISO Nominates Intel Expert to Board of Directors (opens the original)
Read excerpt
Looking to read the full article? Scroll down and login or sign up today! Page Reload Scroll Position MISO Nominates Intel Expert to Board of Directors MISO Director Theresa Wise | © RTO Insider Sep 23, 2026 | Amanda Durish Cook The MISO Board of Directors is likely to have a new member beginning in 2027, one with cybersecurity and government intelligence experience. MISO Board of Directors KeywordsMidcontinent Independent System Operator (MISO)MISO Board of DirectorsMISO Board Week Amanda Duris
Entergy Objects to MISO’s $70M JTIQ Cost Assignment for Lone Star Plant (opens the original)
Read excerpt
Looking to read the full article? Scroll down and login or sign up today! Page Reload Scroll Position Entergy Objects to MISO’s $70M JTIQ Cost Assignment for Lone Star Plant Entergy Texas’ Orange County Advanced Power Station under construction | Entergy Texas Sep 22, 2026 | Amanda Durish Cook Entergy Texas has filed a complaint against MISO over the grid operator proposing to assign $70 million in interregional transmission upgrades to the utility’s Lone Star power station. MISONatural GasSPPTr
Stakeholders Call for Earlier MISO Evaluations on Transmission Project Cost Overruns (opens the original)
Read excerpt
//www.rtoinsider.com/wp-content/uploads/2026/09/tts1788291698-141652.mp3 Some stakeholders asked MISO to intervene earlier with re-evaluations when transmission projects significantly exceed their budgets and to give more serious thought to canceling projects that become too overpriced. The discussion stemmed from MISO’s decision to let a nearly 25% cost increase stand on the now $1.2 billion Iron Range-Benton County-Big Oaks project, one of the components of MISO’s first long-range transmission
Braun Demands Investigation into NIPSCO Storm Prep After 2-week Blackout (opens the original)
Read excerpt
Looking to read the full article? Scroll down and login or sign up today! Page Reload Scroll Position Braun Demands Investigation into NIPSCO Storm Prep After 2-week Blackout A home with an uprooted tree in Gary, Ind. | Benjamin Front via Facebook Aug 25, 2026 | Amanda Durish Cook Indiana Gov. Mike Braun announced that his office is seeking an investigation into Northern Indiana Public Service Co.’s storm readiness and response after a powerful derecho and cluster of tornadoes left residents wit
Publishing over time
Last 90 days. Choose a month to open its work.
Recurring subjects
Named in the text we hold. One piece can cover several.
Audience
Top 5M sites
For RTO Insider, the outlet · Measured Aug 1, 2026
Website popularity band, not a count of readers or article views.
About this data
Counts cover the work we have indexed. Tone needs enough text and a confident classification. Excerpts and episode notes are not full articles or transcripts.
Identity or attribution wrong? Suggest a correction.