ENR Critical Path Podcast
ENR’s Critical Path Podcast delivers insights from leading industry experts and decision-makers about the latest construction industry innovations, issues and developments. | Check out ENR's new Groundbreakers Podcast here!
- Indexed episodes, last 90 days
- 5
- Latest publication
- Aug 17, 2026
- Audience
- Checking…
- Earliest in this view
- Jul 6, 2026
Latest episodes
Allie Kelly on solar-powered roads, sustainable land management, and the legacy of The Ray. (opens the original)
Read excerpt
The executive director of a non-profit that works with DOTs and multiple other entities on cutting-edge research for transportation and land use innovation chats with Deputy Editor Aileen Cho about its past, present and future.
Bluebeam CEO Usman Shuja Talks About Construction Documents and Technology (opens the original)
Read excerpt
Bluebeam CEO Usman Shuja discusses the role of the portable document format (PDF) technology in construction documents and what the AI-powered future holds for Bluebeam and Nemetschek AG with ENR Senior Editor Jeff Yoders.
Aon Executives Talk AI, Data Centers, and the Risk Trends for Construction (opens the original)
Read excerpt
At an industry symposium in June, Deputy Editor Aileen Cho interviewed three key leaders of the global insurance broker, including Rob McDonough (pictured), CEO of Construction, Infrastructure, and Surety for North America.
ENR Critical Path | Special Edition: What Happens After Structural Failure? (opens the original)
Read excerpt
When construction abruptly stopped at the former Pfizer headquarters redevelopment in Midtown Manhattan after workers discovered buckled steel columns and floor sagging, public attention quickly turned to one question: What happened? But before investigators can determine why a structural failure occurred, engineers must answer a different question: How do they stabilize a damaged building and safely determine what went wrong? In this special edition of the ENR Critical Path Podcast, host Bryan
Modernizing Water Assets with High-Performance Polysiloxane Coatings (opens the original)
Read excerpt
Polysiloxane coatings are redefining long-term protection for water storage and treatment assets. In this episode, learn how these advanced systems outperform traditional epoxy and polyurethane coatings with superior UV resistance, durability and reduced maintenance needs. Explore how the smooth, non-porous surfaces of polysiloxanes help minimize biofilm and algae growth, supporting cleaner assets and improved water quality. You’ll also gain insight into lifecycle cost savings and why utilities
Publishing over time
Last 90 days. Choose a month to open its work.
Recurring subjects
Named in the text we hold. One piece can cover several.
Audience
No verified audience measurement yet.
About this data
Counts cover the work we have indexed. Tone needs enough text and a confident classification. Excerpts and episode notes are not full articles or transcripts.
Identity or attribution wrong? Suggest a correction.